Radiator Hose
Heavy Duty Heater Hose
Designed to provide reliable heavy duty and off-road equipment service
Product Description
Designed to provide reliable heavy duty and off-road equipment service, the Hongan Duty Heater Hose is our quality rubber heater hose, made with the highest quality EPDM compounds and heavy duty spiral reinforcement to withstand high coolant and under-hood temperatures of -40˚F (-40˚C) to +248˚F (+120˚C), and provide excellent resistance to coolant and coolant additives. This hose exceeds SAE 20R3, Class D-1, Type EC, standard wall construction requirements.
Note: not suitable for fuel or oil transfer.
Parameter
Type | SAE 20R3 Heater hose for normal service | ||
Hose Class | low oil resistant, improved service | ||
Feature | Excellent resistance to water, steam, coolant, weathering, ozone | ||
Application | For delivery of coolant, hot water in automotive coolant system |
The most common sizes
No. | Size | ID | OD | ||
Inch | mm | Inch | mm | ||
1 | 3/8" | 0.374 | 9.5 | 0.610 | 15.5 |
2 | 1/2" | 0.500 | 12.7 | 0.787 | 20.0 |
3 | 5/8" | 0.622 | 15.8 | 0.945 | 24.0 |
4 | 3/4" | 0.752 | 19.1 | 1.063 | 27.0 |
5 | 7/8" | 0.874 | 22.2 | 1.181 | 30.0 |
6 | 1" | 1.000 | 25.4 | 1.378 | 35.0 |
FAQ
1. Can you provide the certificate of origin?
A: We can provide a free certificate of origin to help you clear customs smoothly, reduce tariffs and gain more profits.
2. What certifications have you obtained?
A: IATF16949
3. What is your price terms?
A: EXW, FOB and others
4. What is your terms of packing?
A: Generally, neutral brown cartons. Also can customize according to your request
5. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery.
6. How about your delivery time?
A: Generally, 30-45 days after receiving the deposit.
7. Can you produce according to the samples?
A: Of course, we have our R&D department and lab, which can customize and develop new products based on sample or drawing, and we can also issue our factory's test report.
8. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the express fee of the sample.
9. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery.
10. What if there is a quality problem?
If it is our responsibility, we will change it.